Business Opportunities

Chandrayaan-II to be over by 2012-13: Isro

Chandrayaan-II moon mission, which will help in analysis of mineral composition and undertake terrain mapping of the moon, will be completed by 2012-13, Project Director of Chandrayaan Dr M Annadurai said today. - Chandrayaan-II will be a technical challenge: Mission director - Kalam advises Isro, Nasa on Chandrayaan-II - Now Chandrayaan-II will have Indian rover “The Rs 425 crore project will be completed by 2012-13. As opposed to Chandrayaan-1 which was a moon orbiter, in Chandrayaan-2, the two moon rovers will actually land on the moon surface,” he said inaugurating the sixth National Student Conference at University Visveswaraya College of Engineering. “Chadrayaan-II will consist of the spacecraft and a landing platform with two moon rovers, one from India and one from Russia, which will land on the moon and move on wheels on the lunar surface, pick up samples of soil or rocks, do a chemical analysis and send the data to the spacecraft orbiting above,” Annadurai said. Annadurai, the Project Director of Chandrayaan-I and II, said the Chardrayaan-I, which was the 70th satellite to go on the moon, “created history with discovery of water there (moon)”. “The Rs 386 crore project (Chandrayaan-I) which took four and a half years to be completed has provided 6 terabits of data which will take the scientists three years to mull over,” he said.


Add your comment:
Name:
Site address: http://
Your message:
Enter today\\\\'s date, 2 digits
(spam protection):

News of the day
MNP norms by August-end: Trai
The Telecom Regulatory Authority of India (Trai) today said the guidelines for mobile number portability (MNP) were likely to be ready by August-end and asked operators to keep their networks ready to roll out the services quickly.
Popular Articles
quick payday loans

Assocham appoints Swati Piramal as its new president
Swati Piramal, Director of Piramal Healthcare, was elected president of Assocham today.

FMPs in focus as investors rush for tax sops
Fixed maturity plan (FMP) launches, which had slowed down since the end of 2008, have again gathered steam with mutual funds rushing to meet investors’ demand for such plans ahead of the financial year end for the tax incentive FMPs provide.